| Haymarket is being expanded with the addition of a terminating platform which is to be numbered 0. I will update this collection as work progresses |
101: New electrification masts in place Buy Print |
102: JCB waits its next duty on the new trackbed Buy Print |
103: Platform 1 shuttered off Buy Print |
104: View from steps between station and Caley Ale House Buy Print |
105: The bay can be seen being cut from the present car park area Buy Print |
106: Platform edge is now more complete, and excavation appears to be complete Buy Print |
107: Looking west from the island platform shows the largely complete platform edges Buy Print |
108: new crossovers and connection to Platform 0 can be seen as the Stirling express service crosses from the Fife lines in the distance and the Motherwell service sneaks off to the left Buy Print |
109: New meets old - the taper has been removed and the mini digger looks a long way down Buy Print |
110: men at work with the new safety fencing in place Buy Print |
111: Manholes in place and the hardcore awaits tarmac Buy Print |
112: Platform edge takes shape Buy Print |
113: fencing posts in place on the car park side of the bay - really starting to take shape Buy Print |
114: Lampposts and paving slabs the latest additions Buy Print |
115: heavy plant in evidence Buy Print |
116: Trackwork extends almost to the end of the bay Buy Print |
117: two road rail machines are just seen through the fencing protecting the car park Buy Print |
118: surfacing almost complete at the west end Buy Print |
119: looking east showing the largely complete platform and fencing Buy Print |
120: the blue wooden hoardings hve been replaced with metal panel fencing allowing glimpses of the new platform - the closk appears temporary, but furtther away can just be seen the platform starter indicators Buy Print |
121: contractors work to commission the lighting Buy Print |
122: the starter signal is obscured by the OHL support from this angle, but should be visible from the cab Buy Print |
123: Platform 1 canopy is finished with new lights in place Buy Print |
124: up on the roof Buy Print |
125: still a way to go with the canopy works, with only four days to go Buy Print |
126: new signals at the east end of the station, presumably for reversible working Buy Print |
127: 158732 on the 1133 Edinburgh - Dunblane passes an uncommissioned but poorly covered signal head on Platform 4 - the yellow cover conceals a phone Buy Print |
128: 170454 at the buffers on day 1 Buy Print |
129: off indicator sign Buy Print |
130: 170456 ready for departure with the 0923 Cowdenbeath Buy Print |
131: 158 passes newly commissioned turn back signal Buy Print |
132: 170456 awaits the road Buy Print |
133: drivers eye view Buy Print |
134: 170456 driving cab (door had been left open!) Buy Print |
135: and finallly....170456 on the first passenger train from Platform 0, the two earlier arrivals having gone through to Waverley! Buy Print |
136: Different time zones?? Buy Print |
![]() |
![]() |
![]() |
|
© 1998-2009 Donald Stirling - All copyrights rest with the Author [ descript.ion | Buy Prints of this Collection | Index ] |